TURKISH ELECTRICITY TRANSMISSION CORPORATION (TEİAŞ)

NONAME OF ENTERPRISEDESCRIPTION OF WORKSDATE OF COMMENCEMENTDATE OF COMPLETIONVALUE
1GENERAL DIRECTORATE OF TURKISH ELECTRICITY TRANSMISSION CORPORATION - ANKARAH.259 REF., 154 KV. 7,6 km. SINGLE CIRCUIT, 39,8 km DOUBLE CIRCUIT 1272 MCM CONDUCTIVE AFYON 2 - ÇAY SEKA (REHABILITATION) ( ~47,4 km ) ETL13 12 200709 09 2008
7.705.777,59 TL
2GENERAL DIRECTORATE OF TURKISH ELECTRICITY TRANSMISSION CORPORATION - ANKARAH.293 REF. 154 KV. SINGLE CIRCUIT ( ~ 47,5 km) 1272 MCM CONDUCTIVE KEŞAN SUBSTATION - ENEZ SUBSTATION ETL08 04 200922 02 2010
5.440.000,00 TL
3GENERAL DIRECTORATE OF TURKISH ELECTRICITY TRANSMISSION CORPORATION - ANKARAH.295 REF., 154 KV. SINGLE CIRCUIT ( ~ 49 km ) 1272 MCM CONDUVTIVE, SUNGURLU INDUSTRIAL ZONE - ALACA SUBSTATION ETL18 12 200807 01 2010
4.284.000,00 TL
4GENERAL DIRECTORATE OF TURKISH ELECTRICITY TRANSMISSION CORPORATION - ANKARAH.279 REF., 154 KV. DOUBLE CIRCUIT 954 MCM CONDUCTIVE ( SİİRT - SİLOPİ PS.3) BRŞ.N. - SİLOPİ TPP (~ 18,2 km)  ETL16 07 200831 12 2008
2.980.908,00 TL
5GENERAL DIRECTORATE OF TURKISH ELECTRICITY TRANSMISSION CORPORATION - ANKARAHTÇ.241 REF.,
1-154 KV. B.BAKKALKÖY SUBSTATION - K.BAKKALKÖY SUBSTATION E.T.L. 2X795 MCM CONDUCTIVE (10,5 km)
2-154 KV.KEBAN 2 - ELAZIĞ 2 ETL 2X795 MCM CONDUCTIVE (58 km)
3-154 KV. OSMANİYE SUBSTATION - ERZİN SUBSTATION ETL 2X795 MCM CONDUCTIVE (10 km) 
18 06 200731 12 2007
743.000,00 TL
6GENERAL DIRECTORATE OF TURKISH ELECTRICITY TRANSMISSION CORPORATION - ANKARAH.237 REF. 154 KV. DOUBLE CIRCUIT 1272 MCM CONDUCTIVE (PS3-ULUDERE) BRŞ.N. - ŞIRNAK SUBSTATION ( ~ 1,7 km) E.T.L.08 06 200702 10 2007
594.000,00 TL
7TEİAŞ  DIRECTORATE OF
3RD CONVEYING
ESTABLISHMENT GROUP
– İZMİR
PERFORMING DIVERSION IN THE PART BELONGING TO  THE 
3-4-5 NUMBERED POLES FROM THE E.İ LINE OF UZUNDERE
KARABAĞLAR BY 154 KV. DOUBLE CIRCUIT 1272 MCM ACSR CONDUCTORS.
02 03 201022 04 2010
478.000,00 TL
818th GROUP DIRECTORATE OF TRANSMISSION FACILITY AND ENTERPRISE of TEİAŞ - ADANA18.H.1 REF., 154 KV.2X495 MCM (İSKENDERUN 2 - ANTAKYA 1) BRŞ. İSKENDERUN 3 E.T.L.14 05 200717 10 2007
474.000,00 TL
9GENERAL DIRECTORATE OF TURKISH ELECTRICITY TRANSMISSION CORPORATION - ANKARAH.229 REF. 154 kV.LUK SINGLE CIRCUIT, 1272 MCM CONDUCTIVE TUNCELİ SUBSTATION CONNECTIONS (TUNCELİ-PÜLÜMÜR ~1,108 km.  and ELAZIĞ - TUNCELİ ~0,484 km) ETL.19.10.200618 05 2007
363.900,00 TL
10DEPARTMENT OF TRANSMISSION FACILITIES AND MAINTENANCE OF TEİAŞ  154 KV. And 380 KV ETL for FORMULA-1 CONJUNCTION ROAD  24 02 200528 04 2005
348.000,00 TL
1112th GROUP DIRECTORATE OF TRANSMISSION FACILITY AND ENTERPRISE of TEİAŞ - GAZİANTEP154 KV. 477 MCM CONDUCTIVE - OSMANİYE - GAZİANTEP ETL ( PYLON: VARIANT BETWEEN 298-303)13 04 200711 05 2007
263.000,00 TL
12ISPARTA ELECTRICITY DISTRIBUTION ENTERPRISE OF TEDAŞ INC. LV + MV ELECTRICITY FACILITY FOR ISPARTA SÜTÇÜLER DISTRICT AND ADJACENT VILLAGES  03 01 200020 12 2000
113.215,49 TL
133rd GROUP DIRECTORATE OF TRANSMISSION FACILITY AND ENTERPRISE of TEİAŞ  154 KV.BORNOVA - ALSANCAK ETL22 06 200929 07 2009
109.500,00 TL
14GENERAL DIRECTORATE OF TURKISH ELECTRICITY TRANSMISSION CORPORATION - ANKARA380 kV. İKİTELLİ - ALİBEYKÖY ETL BRŞ.N. - ATIŞALANI ETL CONNECTION and CONSTRUCTION OF MISSING CAMPER CONNECTIONS ON THE BRŞ.N. - ATIŞALANI ETL PYLON NO. 17 NO 14 12 200402 02 2005
17.000,00 TL